Batamix Logo
Batamix Logo

finland

Neste, Kilpilahti

Neste, Kilpilahti

Neste, Kilpilahti

Year:

2026

2026

Scope of work:

Scope of work:

pipe welding and installation on the site.

pipe welding and installation on the site.

Easpring Finland, Kotka

Easpring Finland, Kotka

Easpring Finland, Kotka

Year:

2026

2026

Scope of work:

Scope of work:

pipe welding and installation on the site.

pipe welding and installation on the site.

Perstorp TA2026

Perstorp TA2026

Perstorp TA2026

Year:

2026

2026

Scope of work:

Scope of work:

various mechanical and repair works.

various mechanical and repair works.

Nebius Data Center, Mäntsälä

Nebius Data Center, Mäntsälä

Nebius Data Center, Mäntsälä

Year:

2025

2025

Scope of work:

Scope of work:

prefabrication of the piping at client‘s workshop.

prefabrication of the piping at client‘s workshop.

Fortum

Fortum

Fortum

Year:

2025

2025

Scope of work:

Scope of work:

prefabrication of the piping at client‘s workshop and welding and installation on the site.

prefabrication of the piping at client‘s workshop and welding and installation on the site.

TA2024 Neste Porvoo

TA2024 Neste Porvoo

TA2024 Neste Porvoo

Year:

2024

2024

Scope of work:

Scope of work:

various repair works, welding works with TIG and MMA welding methods, mechanical works.

various repair works, welding works with TIG and MMA welding methods, mechanical works.

New Kemi bioproduct mill | Metsä Fibre

New Kemi bioproduct mill | Metsä Fibre

New Kemi bioproduct mill | Metsä Fibre

Year:

2023

2023

Scope of work:

Scope of work:

welding and installation of new pipelines.

welding and installation of new pipelines.

Umicore Finland, Kokkola

Umicore Finland, Kokkola

Umicore Finland, Kokkola

Year:

2023

2023

Scope of work:

Scope of work:

welding and installation of new pipelines.

welding and installation of new pipelines.

Helen project, Vuosaari

Helen project, Vuosaari

Helen project, Vuosaari

Year:

2021 - 2022

2021 - 2022

Scope of work:

Scope of work:

welding and installation of new pipelines.

welding and installation of new pipelines.

TA2021 Neste Porvoo

TA2021 Neste Porvoo

TA2021 Neste Porvoo

Year:

2021

2021

Scope of work:

Scope of work:

various repair works, welding works with TIG and MMA welding methods, mechanical works.

various repair works, welding works with TIG and MMA welding methods, mechanical works.

Stora Enso Oulu Mill, OCO Project

Stora Enso Oulu Mill, OCO Project

Stora Enso Oulu Mill, OCO Project

Year:

2020

2020

Scope of work:

Scope of work:

various repair works, welding works with TIG and MMA welding methods. Material carbon and stainless steel.

various repair works, welding works with TIG and MMA welding methods. Material carbon and stainless steel.

Naantali Power Plant

Naantali Power Plant

Naantali Power Plant

Year:

2019

2019

Scope of work:

Scope of work:

 welding and fitting works on stainless steel piping. Welding method TIG and MMA.

 welding and fitting works on stainless steel piping. Welding method TIG and MMA.

Costa Smeralda, Turku Repair Yard

Costa Smeralda, Turku Repair Yard

Costa Smeralda, Turku Repair Yard

Year:

2019

2019

Scope of work:

Scope of work:

various interior works inside the ship.

various interior works inside the ship.

Prefabrication of pipes, Tampere

Prefabrication of pipes, Tampere

Prefabrication of pipes, Tampere

Year:

2019

2019

Scope of work:

Scope of work:

prefabrication of pipes at our workshop in Lithuania and final assembly at client's workshop. Welding method - 141, material - stainless steel.

prefabrication of pipes at our workshop in Lithuania and final assembly at client's workshop. Welding method - 141, material - stainless steel.

Manufacturing and assembly of underground tanks, Neste, Porvoo

Manufacturing and assembly of underground tanks, Neste, Porvoo

Manufacturing and assembly of underground tanks, Neste, Porvoo

Year:

2018

2018

Scope of work:

Scope of work:

manufacturing and assembling of tanks from carbon steel in the clients workshop. Welding method - 135/136 (MIG/MAG). Thickness - 10mm.

manufacturing and assembling of tanks from carbon steel in the clients workshop. Welding method - 135/136 (MIG/MAG). Thickness - 10mm.

Stora Enso Oyj, Heinola

Stora Enso Oyj, Heinola

Stora Enso Oyj, Heinola

Year:

2017

2017

Scope of work:

Scope of work:

manufacturing and assembling of tank from stainless steel. Welding method - 141 (TIG) and 135/136 (MIG/MAG). Thickness - 3 - 5mm. 

manufacturing and assembling of tank from stainless steel. Welding method - 141 (TIG) and 135/136 (MIG/MAG). Thickness - 3 - 5mm. 

TA2017 BOREALIS, Porvoo

TA2017 BOREALIS, Porvoo

TA2017 BOREALIS, Porvoo

Year:

2017

2017

Scope of work:

Scope of work:

various repair works.

various repair works.

TA2017 Naantali Refinery at Neste

TA2017 Naantali Refinery at Neste

TA2017 Naantali Refinery at Neste

Year:

2017

2017

Scope of work:

Scope of work:

various repair works.

various repair works.

Metsä Fibre Äänekoski Bioproduct mill project

Metsä Fibre Äänekoski Bioproduct mill project

Metsä Fibre Äänekoski Bioproduct mill project

Year:

2017

2017

Scope of work:

Scope of work:

Welding and fitting of various pipelines, fitting of various equipment, prefabrication and fitting of supports. Pipelines of stainless steel, chrome and carbon steel. Thickness  from 1mm to 12mm. Welding methods 141 and 111.

Welding and fitting of various pipelines, fitting of various equipment, prefabrication and fitting of supports. Pipelines of stainless steel, chrome and carbon steel. Thickness  from 1mm to 12mm. Welding methods 141 and 111.

Welding and fitting of heat exchanger for Neste refinery

Welding and fitting of heat exchanger for Neste refinery

Welding and fitting of heat exchanger for Neste refinery

Year:

2017

2017

Scope of work:

Scope of work:

assembly and welding of heat exchanger (stainless steel ,P9) in the client workshop. TIG (141) welding method. Wall thickness - 10 mm, elbows ~15 mm.

assembly and welding of heat exchanger (stainless steel ,P9) in the client workshop. TIG (141) welding method. Wall thickness - 10 mm, elbows ~15 mm.

Kemira Mercury project, Kouvola

Kemira Mercury project, Kouvola

Kemira Mercury project, Kouvola

Year:

2017

2017

Scope of work:

Scope of work:

assembly and welding of pipelines (stainless steel). TIG (141) welding method. Wall thickness - 2,3 mm.

assembly and welding of pipelines (stainless steel). TIG (141) welding method. Wall thickness - 2,3 mm.

Metsä Fibre Äänekoski Bioproduct mill project

Metsä Fibre Äänekoski Bioproduct mill project

Metsä Fibre Äänekoski Bioproduct mill project

Year:

2016

2016

Scope of work:

Scope of work:

assembly and welding of tanks (carbon and stainless steel). 136 and 111 welding methods.

assembly and welding of tanks (carbon and stainless steel). 136 and 111 welding methods.

Prefabrication and assembly of tanks at client's workshop

Prefabrication and assembly of tanks at client's workshop

Prefabrication and assembly of tanks at client's workshop

Year:

2016

2016

Scope of work:

Scope of work:

assembly and welding of new tanks (carbon and stainless steel).136 and 111 welding methods. Wall thickness – 6 mm.

assembly and welding of new tanks (carbon and stainless steel).136 and 111 welding methods. Wall thickness – 6 mm.

FE2, Kotkamills

FE2, Kotkamills

FE2, Kotkamills

Year:

2016

2016

Scope of work:

Scope of work:

repair of old stainless steel pipes and the installation of new lines. 141 welding method.

repair of old stainless steel pipes and the installation of new lines. 141 welding method.

Contact us to find out details of the projects we work on.

Contact us to find out details of the projects we work on.

Contact us to find out details of the projects we work on.