Finland

FINLAND

New Kemi bioproduct mill | Metsä Fibre

 Year: 2023 
Number of workers: 10 - 25 persons
Scope of work: welding and installation of new pipelines.

Umicore Finland, Kokkola

Year: 2023 
Number of workers: 10 - 30 persons
Scope of work: welding and installation of new pipelines.

Helen project, Vuosaari

Year: 2021 - 2022 
Number of workers: 4 - 29 persons
Scope of work: welding and installation of new pipelines.

TA2021 Neste Porvoo

Year: 2021 
Hours of work: 18 857
Number of workers: 33 persons
Scope of work: various repair works, welding works with TIG and MMA welding methods, mechanical works.

Stora Enso Oulu Mill, OCO Project

Year: 2020 
Hours of work: 8623,5
Number of workers: 14 - 22 persons
Scope of work: various repair works, welding works with TIG and MMA welding methods. Material carbon and stainless steel.

Naantali Power Plant

Year: 2019 
Hours of work: 5717
Number of workers: 8 - 9 persons
Scope of work: welding and fitting works on stainless steel piping. Welding method TIG and MMA.

Costa Smeralda, Turku Repair Yard

Year: 2019
Hours of work: 5936,5
Number of workers: 7 - 9 persons
Scope of work: various interior works inside the ship.

Prefabrication of pipes, Tampere

Year: 2019
Hours of work: 1500
Number of workers: 4 persons
Scope of work: prefabrication of pipes at our workshop in Lithuania and final assembly at client's workshop. Welding method - 141, material - stainless steel.

Manufacturing and assembly of underground tanks, Neste, Porvoo

Year: 2018
Hours of work: 1869
Number of workers: 3 persons
Scope of work: manufacturing and assembling of tanks from carbon steel in the clients workshop. Welding method - 135/136 (MIG/MAG). Thickness - 10mm.

Stora Enso Oyj, Heinola

Year: 2017
Hours of work: 1337
Number of workers: 5 - 10 persons
Scope of work: manufacturing and assembling of tank from stainless steel. Welding method - 141 (TIG) and 135/136 (MIG/MAG). Thickness - 3 - 5mm. 

TA2017 BOREALIS, Porvoo

Year: 2017
Hours of work: 1211
Number of workers: 4 - 11 persons
Scope of work: various repair works.

TA2017 Naantali Refinery at Neste

Year: 2017
Hours of work: 2697
Number of workers: 6 - 7 persons
Scope of work: various repair works.

Production of Biogas equipment

Year: 2017 m.
Hours of work: 1205
Number of workers: 5 persons
Scope of work: welding and fitting of industrial pipelines from carbon and stainless steel. Welding method TIG (141). Thickness up to 6mm.

Metsä Fibre Äänekoski Bioproduct mill project

Year: 2017
Hours of work: 5918
Number of workers: 11 persons
Scope of work: Welding and fitting of various pipelines, fitting of various equipment, prefabrication and fitting of supports. Pipelines of stainless steel, chrome and carbon steel. Thickness  from 1mm to 12mm. Welding methods 141 and 111.

Welding and fitting of heat exchanger for Neste refinery

Year: 2017
Hours of work: 910
Number of workers: 2 persons
Scope of work: assembly and welding of heat exchanger (stainless steel ,P9) in the client workshop. TIG (141) welding method. Wall thickness - 10 mm, elbows ~15 mm.

Kemira Mercury project, Kouvola

Year: 2017
Hours of work: 5,897
Number of workers: 6 -16 persons
Scope of work: assembly and welding of pipelines (stainless steel). TIG (141) welding method. Wall thickness - 2,3 mm.

Metsä Fibre Äänekoski Bioproduct mill project

Year: 2016
Hours of work: 4,502
Number of workers: 4 - 9 persons
Scope of work: assembly and welding of tanks (carbon and stainless steel). 136 and 111 welding methods.

Prefabrication and assembly of tanks at client's workshop

Year: 2016
Hours of work: 2,096
Number of workers: 3 persons
Scope of work: assembly and welding of new tanks (carbon and stainless steel).136 and 111 welding methods. Wall thickness – 6 mm.

FE2, Kotkamills

Year: 2016
Hours of work: 6,188
Number of workers: 6–15 persons
Scope of work: repair of old stainless steel pipes and the installation of new lines. 141 welding method.